PTC

Integrate Localization into Your CI/CD Pipeline with the PTC API

Learn how to integrate the PTC API into your CI/CD pipeline to deliver human-quality AI translations as part of your build process.

  • Secure by design — no repository read or write access required.
  • Compatible with any CI/CD system, with ready-made configurations included.
  • Controlled access through project-specific API tokens.
  • Human-quality translations delivered in minutes, directly in your build.

How the CI/CD Integration Works

Before you set up PTC with your CI system, here are the three principles behind the PTC API and CLI:

1. Resource files are tied to a branch

Every file you send to PTC is linked to a branch name (e.g. main, feature/new-checkout). This keeps translations separate, so translations from different features don’t overwrite each other. When you use the ready-made CI/CD configurations, this mapping is already handled automatically.

2. Translations are processed asynchronously

PTC does not return translations immediately. Instead, it:

  • Uploads the updated files
  • Identifies only the new or modified strings
  • Translates the strings
  • Prepares translated files for download

3. One CLI script works everywhere

Instead of calling the API yourself, use the PTC CLI:

One script handles the entire flow (upload → poll → download). The CLI runs on Linux and macOS, and works with GitHub Actions, GitLab, Bitbucket, or any other CI/CD platform.

High-Level Flow: Set Up the PTC API in Your CI/CD Pipeline

1Sign up for a trial.

Get full access to all features and translate up to 20,000 words into any two languages you choose.

2Create a new project.

When choosing how to use PTC, select API integration. During setup, you’ll provide a bit of context about your project (what it does, who it’s for) and select the languages you want to translate into.

3Get your API token.

At the end of the setup, you’ll receive a project-specific API token. Copy it and store it safely — you’ll need it to authenticate all requests. You can always find the same token again in your project dashboard under Settings → PTC API tokens.

Getting the PTC API token from project setup
Getting the API token during project setup
Getting the PTC API token from the dashboard
Getting the API token from the PTC dashboard

4Add the PTC API token to your repository in the right location.

Provider Where to add the token
GitHub Actions Go to Settings → Secrets and variables → Actions and add PTC_API_TOKEN. Then go to Settings → Actions → General → Workflow permissions and turn on Allow GitHub Actions to create and approve pull requests. The workflow file already asks for the write access it needs; this checkbox is the one thing it cannot grant itself.
GitLab CI/CD Go to Settings → CI/CD → Variables and add PTC_API_TOKEN.
Bitbucket Pipelines Go to Repository settings → Pipelines → Repository variables and add PTC_API_TOKEN.

5Copy the ready-made CI/CD configuration.

On GitHub Actions, add the PTC Translate action to your workflow. Your API token is the only input you have to pass. The action carries a fixed version of the CLI inside itself, so your build never downloads a script at run time, and when a run produces new translations it opens the pull request for you.

On GitLab CI, Bitbucket Pipelines, or any other platform, copy the job for your platform from the PTC CLI CI/CD templates. Each template pins the CLI to a specific release and publishes the checksum to verify it against, so a later CLI release cannot change what your build runs.

6Run the workflow.

You can trigger the workflow manually, on commits that update resource files, or on a schedule. See triggers for GitHub, GitLab, and Bitbucket. A pull request needs a branch to open against, so on GitHub Actions the PTC Translate action opens one on a push, on a schedule, and on a manual run from a branch. On a pull_request, pull_request_target or merge_group event, or on a tag or a release, it stops with an explanation instead - translate on a push to your source branch, or set create-pr: false for that run.

When it runs, the CLI uploads your files, waits for translations to finish, and writes the updated translations back into your repository. If you’re using the ready-made configs and the run produced new translations, the workflow will also create a merge request with the changes, so you can review and merge them like any other code update. A run that finds nothing to translate writes nothing and opens no merge request. From here on, your translations stay in sync automatically.

CI/CD Examples

Ruby on Rails
JSON Files (React Apps)

Further Reading

Why Use PTC for Software Translations?

PTC is a complete translation system for developers and product teams — built to keep your code, brand, and audience in sync.

Context-Aware Translations That Protect Your Brand

Before translating, PTC learns about your product, your audience, and your terminology. That’s why 99.5% of sentences go live without edits, and 85% of projects don’t get edited at all.

How PTC’s AI translations protect your brand →

Broad Platform and File Format Support

PTC works with the most popular resource file formats and platforms, including: Android, iOS, React, Vue.js, Angular, Ruby on Rails, JavaScript, Adobe Commerce (Magento), Shopify, and WordPress.

More about supported file formats →

Translate More Than Resource Files

Need to translate release notes, emails, or documentation? PTC also includes a fast “Paste to translate” feature that gives you the same context-aware translations for text outside of code.

How to translate text outside of resource files →

Automate Translations in Your CI/CD

Set up PTC once, and your resource files and translations stay updated automatically in your CI/CD pipeline.